Solar Energy2023Completed
Adani Solar Park
Design, fabrication, and supply of solar module mounting structures for a 150 MW AC solar PV park.
Client
Adani Green Energy
EPC Partner
Sterling & Wilson
Location
Rajasthan
Duration
14 months
Year
2023
The Challenge
Extreme desert conditions with wind speeds exceeding 160 km/h and high ambient temperatures.
Our Solution
STAAD.Pro engineered mounting structures with hot-dip galvanized frames (85-micron minimum).
Products Supplied
Ground-Mount Solar MMS (Fixed Tilt)
HDG Structural Frames & Purlins
Module Clamps & Fasteners
Earthing & Bonding Hardware
Results & Impact
Supplied MMS for 150 MW capacity
Wind tunnel validated for 180 km/h gust
Completed 2 weeks ahead of schedule
Zero failures reported during monsoon storms