Cement2022Completed
Ambuja Cements Marwar Expansion
Providing the main cable routing network and earthing for the integrated clinker grinding unit.
Client
Ambuja Cements (Adani Group)
EPC Partner
ThyssenKrupp Industrial
Location
Rajasthan
Duration
20 months
Year
2022
The Challenge
Complex vertical routing in the pre-heater tower required high-load bearing ladder structures and safe working access for cabling teams.
Our Solution
Designed custom 6-metre ladder trays with integrated rungs for heavy power cables. Supplied specialized bracketry for tower-mount installation.
Products Supplied
Heavy-Duty HDG Ladder Trays
Tower Mounting Brackets
GI Flat Grounding (75x12mm)
Instrument Cable Trays
Results & Impact
Completed cable routing for 100m high tower
Zero accidents during cabling phase
High load rating (200kg/m) verified on-site
Fast-track delivery helped meet Adani takeover goals