Urban Infra2025Ongoing
Bangalore Metro Airport Line
Supply of all signal and telecom cable trays for the 56km Airport Blue Line corridor.
Client
BMRCL
EPC Partner
Afcons Infrastructure
Location
Karnataka
Duration
24 months
Year
2025
The Challenge
Elevated sections required aesthetic integration with station architecture. Strict weight limits for cantilever supports over the busy Hebbal flyover area.
Our Solution
Designed sleek, low-profile GI perforated trays with high strength-to-weight ratio. Used automated welding for consistent finish quality.
Products Supplied
Low-Profile Perforated Trays
Sleek Station Brackets
Signal Cable Raceways
Earth Bonding Jumpers
Results & Impact
Phased delivery for 15 elevated stations
Lightweight design saved 15% structural cost
BMRCL technical approval for all tray designs
On-site support for installation training provided