Transmission2025Ongoing
Green Energy Corridor - Phase II
Supplying foundational earthing and structural steel for the massive renewable energy evacuation network in western India.
Client
Adani Transmission
EPC Partner
Kalpataru Projects
Location
Rajasthan
Duration
22 months
Year
2025
The Challenge
Desert environment with high soil resistivity. Large-scale substation sites required thousands of tons of GI flats and rods delivered in quick succession.
Our Solution
Custom earth mat layout optimization to reduce copper usage while meeting safety standards. High-volume galvanizing for structural steel lattice frames.
Products Supplied
GI Earthing Flats (100x12mm)
Substation Lattice Towers
Copper-Bonded Round Conductors
Earth Inspection Pits
Results & Impact
Supplied 1200+ tons of earthing materials
Achieved < 0.5 ohm resistance in sandy soil
Synchronized delivery across 4 remote sites
Listed as primary vendor for upcoming GEC-III