Urban Infra2024Ongoing
Kolkata Metro East-West Line
Engineering and supply of structural steel support systems, cable management, and earthing materials for Kolkata's East-West Metro corridor.
Client
KMRC
EPC Partner
Afcons Infrastructure
Location
West Bengal
Duration
36 months
Year
2024
The Challenge
Underground metro sections required fire-resistant coatings and compact support designs within limited tunnel clearances.
Our Solution
Supplied hot-dip galvanized structural supports with intumescent fireproofing where specified. Cable trays were designed in modular sections.
Products Supplied
HDG Structural Steel Supports
Galvanized Perforated Cable Trays
Earthing & Lightning Protection Systems
Tunnel Cable Brackets
Results & Impact
Delivered supports for 8 stations
Modular design reduced installation time by 30%
Fire-resistant coating certified for 120-minute rating
Successfully integrated with tunnel boring systems