Hyperscale Data Center - Mumbai
Data Centers2025Ongoing

Hyperscale Data Center - Mumbai

Integrated cable management and earthing solution for a 50 MW Tier-IV facility.

Client
Global Tech Giant
EPC Partner
Sterling & Wilson
Location
Navi Mumbai
Duration
18 months
Year
2025

The Challenge

High-density server racks required lightweight yet high-strength support to reduce floor loading.

Our Solution

Supplied high-strength Aluminum Alloy (6063-T6) cable trays and copper-mesh earthing.

Products Supplied

Aluminum Alloy 6063-T6 Cable Trays
Fiber Optic Raceways (Yellow)
Copper Grid Earthing (Mesh)
Zero-Potential Bonding Bars

Results & Impact

Aluminum trays reduced ceiling load by 40%
Achieved 0.1 ohm potential difference
Custom fiber raceways integrated seamlessly
Sterling & Wilson strategic supply partner