Aviation2025Ongoing
Navi Mumbai International Airport
Supply of heavy structural supports and grounding for the massive MRO hangars and cargo terminal.
Client
Adani Airports
EPC Partner
L&T Construction
Location
Maharashtra
Duration
40 months
Year
2025
The Challenge
Coastal humidity and high salt air exposure. Massive structural loads for aircraft hangar lighting and power systems.
Our Solution
Supplied Z600 HDG structural frames and heavy-duty GI grounding grids. All materials double-checked for coastal longevity.
Products Supplied
Z600 HDG Structural Steel
Hangar High-Bay Supports
Marine-Grade Earthing Strips
Cargo Terminal Cable Trays
Results & Impact
Phased delivery for 3 major hangars
Z600 coating verified for 40-year coastal life
Handled massive structural load audits
L&T construction schedule synchronized