Aviation2025Ongoing
Noida International Airport (Jewar)
Integrated electrical infrastructure for Phase-1 of India's newest greenfield international airport.
Client
YIAPL (Zurich Airport)
EPC Partner
Tata Projects
Location
Uttar Pradesh
Duration
36 months
Year
2025
The Challenge
Aviation-grade safety standards and rapid construction schedule. Large-span terminal areas required trays to bridge 6-metre pillar gaps.
Our Solution
Supplied high-strength large-span ladder trays and advanced lightning protection systems per ICAO standards.
Products Supplied
Large-Span HDG Ladder Trays
Advanced Lightning Protection (ESE)
Airport Lighting Supports
Terminal Earthing Grid
Results & Impact
Phased delivery matching terminal roof installation
Successfully bridged 6m gaps with zero sag
ICAO safety compliance verified
Tata Projects strategic supplier status