PowerGrid Substation Extension
Transmission2023Ongoing

PowerGrid Substation Extension

IES partnered with KEC International to deliver an advanced earthing and grounding matrix for PowerGrid's 400 kV substation extension in Lucknow. This project is a vital component of the Northern Region Transmission System (NRTS) strengthening initiative.

Client
PowerGrid Corporation of India
EPC Partner
KEC International
Location
Lucknow, UP
Duration
12 months
Year
2023

The Challenge

The Lucknow site exhibited high soil resistivity, which posed a significant risk to grid stability. The engineering brief demanded a grounding system that could achieve a resistance of less than 0.5 ohm while maintaining a 50-year service life under constant high-voltage exposure.

Our Solution

Our solution involved the precision supply of molecularly-bonded copper steel earth rods with a guaranteed 254-micron coating thickness. IES coordinated with CAD-based grid models to supply optimized GI earth strips and earth mats that ensure maximum fault current dissipation. This hybrid metallurgy approach provided the institutional-grade safety required for EHV substations.

Products Supplied

Molecularly Bonded Copper Earth Rods (254 Microns)
High-Grade GI Earth Strips (50x6mm)
Heavy-Duty Earth Mat Connectors
Pre-Fabricated Earth Inspection Pits

Results & Impact

Successfully achieved a grid resistance of <0.5 ohm, exceeding PGCIL safety norms
100% of supplied rods passed the molecular bonding adhesion test
Zero non-conformance recorded during PowerGrid technical audits
Awarded the Phase-II expansion contract for the adjoining GIS bay