Transmission2021Completed
NRSS XXIX Transmission Project
Critical infrastructure supply for the Northern Region Strengthening Scheme, providing reliable power to the Kashmir valley.
Client
Sterlite Power
EPC Partner
KEC International
Location
Jammu & Kashmir
Duration
18 months
Year
2021
The Challenge
Extreme climate (snow/ice) and strategic security concerns. Earthing materials required high durability against soil acidity and freeze-thaw cycles.
Our Solution
Supplied copper-bonded steel earth rods with thick 254-micron molecular coating and high-strength galvanized lattice supports.
Products Supplied
Copper-Bonded Earth Rods
High-Strength Lattice Supports
GI Earthing Flats
Tower Foundation Earthing
Results & Impact
Enabled stable power for 3 million people
Zero grounding failures in extreme winter
Phased supply through difficult terrain
Commendation received for supply reliability